Zerocarbonista

The Wind Car (4 of 6) - Time for a name

Filed under: Transport — dale December 16, 2008 @ 2:12 pm

Here it is then, the fourth episode of the making of our wind car.  By the time we get to the sixth I’m hoping it’ll be on the road.


Video production: Tim Walter Associates Limited

Good vid this one, all looks very industrial over there in Norfolk - and stuff is starting to come together.

I’m thinking it’s about time to come up with a name, and I’ve come up with a short list. (more…)

Wind car video update - part 3

Filed under: Transport — dale November 21, 2008 @ 9:12 pm

Here’s the third in our series of monthly wind car videos.


Video production: Tim Walter Associates Limited

You can see the body really starting to take shape here, and hear Peter talk about ‘toughening up’ of the look, from his original.

We’ve ‘placed’ all the parts within the car now and began machining/producing some of the bigger components, like the transmission. (more…)

The Wind Car is on its way -
video update part 2

Filed under: Transport — dale October 20, 2008 @ 9:06 am

Here’s the second of our monthly video updates on the Wind car project.


Video production: Tim Walter Associates Limited

I’m off to Norfolk next week to take a look at the proposed body modifications and generally have a catch up with the team. I’m looking fwd to it.

Chassis has been lengthened, battery housing and transmission are now designed and under construction and we’re very slightly behind the estimated timeline, but still heading for Dec on the road. (more…)

The Wind Car is on its way - Part 1

Filed under: Transport — dale September 15, 2008 @ 10:11 am

Work started in earnest on our wind powered car about 6 weeks ago. We’re making good progress, close to plan and budget so far.

Here’s a short video showing our progress so far:


Video production: Tim Walter Associates Limited

Should be posting one of these a month now as we count down to the day we get this ‘wind powered car’ on the road. (more…)